Home Renovation - Bathroom Remodel - 3

Finally the things are becoming clear and slowly coming to close. With two days left on finishing up the project, the bathtub tiling is done. The full bath tiling is done along with installation of the new W/C. The painting of the walls just started. The pedestal sink on half bath has been installed. It looks like the color I chose is in green shade, but it is called the relaxing Khakhi. I loved the semi gloss rather than flat color. I would love to go with full gloss color, but looks like the full gloss is only recommended as accent color or trims or edges or on wainscoting etc. 

Full Bath pictures




Half Bath Picture
Things still left to do:

Finish the tiling job on the half bath including grout.
Wall between the half bath and full bath.
Install W/C on half bath.
Install vanity in full bath
Painting on both bathrooms.
Install the accent near the vanities.
oops lot of little little stuff, which includes major clean up too :).

We are almost there. I am hoping that lot of things can be taken care of today and done. Good Luck to us.

1 comment:

Unknown said...

That is indeed a relief, if I must say. Glad that you have put the base level components of your bathroom in place, such as the toilet and sink. Just a little bit of recalibration in terms of the pipes and drains and all the stuff that goes with plumbing, and you're good to go. Thanks for sharing that progress! All the best!

Traci Romero @ Harris Plumbing

LinkWithin