Saturday, August 27, 2011

Patio project - Day 2

Second day work was stopped (on 08/20/2011) because of rain in the afternoon. Major part done was railing on 3 sides for the patio and the walk way. Got two loads of sand and realized that they need two more. 


No comments:

LinkWithin

Related Posts with Thumbnails