Things are better almost to the close of the week as we can see somethings wrapping up, after we ordered the hardwood floors. Our contractor gave up on the project last weekend, but as a last resort, he provided us with an option of paying him extra amount for labor and material, so that we wrap it up. We decided to bite the bullet and get it done.
Here is the progress of the week.
Finally they finished the skylight inside the master closet. Issue is looks like there is one place they realized after almost done, that it needed patch work. They are trying to patch that one spot and may be finished hopefully next two working days.
The vanity is almost set up . The grout is not finished on the accent tile since we have to bring it. Looks better now since the lighting is finished too, the water is working (haven't tested fully by checking the hot and cold etc), vanity cabinets has been fixed.
The shower tiling is completed finally along with grout. The shower glass has been set up. Initially they did not consider the step that was coming in the start of the shower. So when they brough the two glass pieces together, they were of different height. They had to raise the shower wall a little bit higher for both of glass sides to match. They fixed the shower doors and had to do a little patch up with that clear thingy between glasses (not sure what the name is).
The hardwood floors has been installed in master bedroom along with the baseboard and the small end part.
So the flooring upstairs is totally done, They painted the doors and frames and installed the fan in bedroom. To protect the flooring while they work (final stages) they laid the cardboard boxes.
The counter top guys came in today and installed today. With all the pulls and under cabinet lighting and the lighting inside the glass cabinets fixed it looks like in much better condition. The appliances are set in place but not fixed yet.
The exhaust and the range placement has been done. They still need to be connected.
The view of the counter top near the stove to other end of home.
The tall cabinet which holds the oven and microwave. Currently they are not connected yet. Once that done, we need to test it.
Here is the progress of the week.
Finally they finished the skylight inside the master closet. Issue is looks like there is one place they realized after almost done, that it needed patch work. They are trying to patch that one spot and may be finished hopefully next two working days.
The vanity is almost set up . The grout is not finished on the accent tile since we have to bring it. Looks better now since the lighting is finished too, the water is working (haven't tested fully by checking the hot and cold etc), vanity cabinets has been fixed.
The shower tiling is completed finally along with grout. The shower glass has been set up. Initially they did not consider the step that was coming in the start of the shower. So when they brough the two glass pieces together, they were of different height. They had to raise the shower wall a little bit higher for both of glass sides to match. They fixed the shower doors and had to do a little patch up with that clear thingy between glasses (not sure what the name is).
The hardwood floors has been installed in master bedroom along with the baseboard and the small end part.
So the flooring upstairs is totally done, They painted the doors and frames and installed the fan in bedroom. To protect the flooring while they work (final stages) they laid the cardboard boxes.
The counter top guys came in today and installed today. With all the pulls and under cabinet lighting and the lighting inside the glass cabinets fixed it looks like in much better condition. The appliances are set in place but not fixed yet.
The exhaust and the range placement has been done. They still need to be connected.
The view of the counter top near the stove to other end of home.
The tall cabinet which holds the oven and microwave. Currently they are not connected yet. Once that done, we need to test it.