Home Renovation - Footing - 3 + Wall framing - 1

The floor tresses started after finishing up the footing. They had the water barrier and gravel covered and then filled up the surrounding with the remaining soil. 

The first pic of the floor tresses

 They filled up the insulation in between and covered it, as we were expecting rain that day.

Then they started on the walls 2 days back. Since kitchen did not have any windows, that became easy to put plywood on.
 The other sides they have to measure and make sure the openings are good and frame for windows and doors. The following pictures show different views of the construction going on.