Contractor started working on the foundation since 4 days. He started on first layer of concrete. Then he is putting cinder blocks 4 layer tall on top of the concrete set. They even started tearing down the front walkway to clear the path and add walkway and porch. Then the floor joists go in. Here is where we are currently. The path till the work today is shown in the below pics.
Part of the cinder blocks done in above picture
Part of the cinder blocks done in above picture