Here we are started the construction work around mid July, after waiting for more than one half month for the permits to come in. for almost past 3 and 1/2 weeks, they were just working on the Electrical, plumbing and HVAC, then some inspections. Now finally filling it in and looking like a little house once they started the dry wall. Here are some pics from the past few weeks and after the dry wall started.
The temporary steps were removed and cinder blocks are laid to make the pathway from kitchen to backyard.
The drywall was put between the master bedroom and bathroom and closet. The pocket doors I asked was to save wall space.
The shower base got ready as the plumbing inspection person insisted on testing the water/sewer flow at the shower.
Once the inspection guy gave a green signal to put in the insulation, the main level got ready with it.
After second day of the dry wall and the patch up this is how kitchen looks.
The temporary steps were removed and cinder blocks are laid to make the pathway from kitchen to backyard.
The drywall was put between the master bedroom and bathroom and closet. The pocket doors I asked was to save wall space.
The shower base got ready as the plumbing inspection person insisted on testing the water/sewer flow at the shower.
Once the inspection guy gave a green signal to put in the insulation, the main level got ready with it.
After second day of the dry wall and the patch up this is how kitchen looks.