This remodel project started last Friday. First day, the old vanity was removed. The vinyl flooring was ripped off. and the sub flooring was prepared to run the new water line for the vanities, new sewer line for the powder room. As part of the project, we also pushed our dryer vent inside to the wall a little bit, which gave our washer a little more room to push inside and be on same level as dryer.
After 4 days of remodel and the person working on it pulled out the tile around the bath tub and added the new dry wall etc.Instead of prying the wall for the small tile, it cut the dry wall and added the new one, which saved us time and less damage to the bathtub.
After 2 days of project, we ordered and got the vanity for full bath, tile for floor and in shower (around the bath tub) , fixtures for shower, faucet, towel rod etc, along with little accent tile also. To give our powder room a more spacious look and feel along with being timeless, my husband opted for the pedestal sink. Finally today, the sink is here too.
After 2 days of project, we ordered and got the vanity for full bath, tile for floor and in shower (around the bath tub) , fixtures for shower, faucet, towel rod etc, along with little accent tile also. To give our powder room a more spacious look and feel along with being timeless, my husband opted for the pedestal sink. Finally today, the sink is here too.
We are hoping to wrap up the project by Feb 3rd. If done, then it would be quick project with major change in functioning of our home on main level.